Drywall Calculator

Room size in — sheets, screws, and mud out.

Room dimensions

Order

19 sheets

4×8 · walls + ceiling

Whole sheets · waste included

≈ 608 screws · 6 gal compound · 1 roll tape

Drywall ≈ $285
ONE WALL — SHEETS RUN VERTICAL 12′-0″ 8′-0″ 19 SHEETS — WALLS + CLG STAGGER END JOINTS · CEILINGS FIRST
Surface 528 ft² (walls 384 + ceiling 144)

Hang ceilings before walls so wall sheets support the ceiling edges — and stagger end joints; they're the ones that crack.

Summary + link — paste into a quote or text

Estimates, not advice. This calculator exists to give you a working idea of the materials a job needs and a rough cost — not numbers to commit money or construction to. Check the figures yourself, or with an appropriately qualified professional, before you order, quote, or build. Read the full disclaimer

How this drywall calculator works

Drywall is an area takeoff: wall perimeter times height, plus the ceiling if you're doing it, minus openings — then whole sheets with waste, and the finishing materials keyed to the same area:

area = 2 × (L + W) × H − openings (+ L × W with the ceiling)
sheets = area × (1 + waste%) ÷ 32 · 4×8 sheet; 48 for 4×12

Worked example: drywall for a 12 × 12 room

Walls: 2 × (12 + 12) × 8 = 384 ft²; ceiling adds 144 for 528 ft². With 10% waste that's 580.8 ft² — 19 sheets of 4×8 (about $285), hung with roughly 608 screws, finished with 6 gallons of compound and one roll of tape.

How much mud, tape and screws per sheet?

Table 1 — Finishing materials per 100 ft² of board
MaterialPer 100 ft²
Screws (16″ o.c. framing)≈ 100
Joint compound, ready-mix≈ 1 gal
Paper tape≈ 37 lf
Standard estimating figures for a taped, three-coat level-4 finish.

Hanging drywall in the right order

  • Ceilings first, so the wall sheets support the ceiling edges.
  • Perpendicular to framing and stagger end joints — butt joints in a straight line telegraph through paint.
  • Cut openings after hanging where you can: hang over doors and windows, then rout them out — fewer measured cuts, tighter fits.
  • ½ in board is standard for walls, ⅝ in for ceilings under trusses 24″ o.c. and anywhere fire code says so.

Drywall FAQ

How many sheets of drywall do I need for a 12 × 12 room?

19 sheets of 4×8, walls and ceiling, with 10% waste — 384 ft² of wall plus a 144 ft² ceiling. In 4×12 sheets it drops to 13. Subtract door and window area in the openings field before trusting either number.

How many screws per sheet of drywall?

About 32 per 4×8 sheet on 16 in framing — screws every 12 in in the field and 8 in on edges. That is one screw per square foot, so the default room runs about 610. Buy the 1¼ in coarse-thread box for ½ in board on wood studs.

How much joint compound per sheet of drywall?

Plan on about 1 gallon of ready-mixed compound per 100 ft² of board for a taped three-coat finish — roughly 6 gallons (a 5-gal bucket plus a pail) for the default room. Texture and skim coats add more.

Should I use 4×8 or 4×12 drywall sheets?

4×12 means fewer joints to tape — the default room drops from 19 sheets to 13 and loses several butt joints — but the sheets weigh ~50% more and need two sets of hands and a clear path in. Solo DIY rooms usually run 4×8; crews run 12s.

How much does it cost to drywall a room?

The default room is about $285 in board at $15 a sheet, plus roughly $40–60 of screws, tape and compound. Hung and finished by a contractor, drywall typically runs $2–3.50 per square foot in 2026 — finishing labor is most of it.

Embed this drywall calculator on your site

Run the drywall calculator on your own site, free. Paste the snippet where you want it; the visible credit link is the only condition.

More interior calculators

Order 19 sheets $285 board · waste incl.