Stone Calculator

Area and depth in — tons of stone out, any type.

Area & depth

Order

2.25 tons

or 1.5 yd³ bulk

Rounded up to the next ¼ ton · allowance included

= 79 × 0.5 ft³ bags

Bulk delivery ≈ $101
Bagged ≈ $474
PLAN 150 SF 15′-0″ 10′-0″ SECTION 3″ STONE OVER FABRIC
Exact volume 1.39 yd³ (38 ft³) before allowance 1 ton covers ≈ 77 ft² at this depth

Lay landscape fabric under decorative stone — it keeps the layer clean of soil for years; skip it under structural crushed lifts that must lock in.

Summary + link — paste into a quote or text

Estimates, not advice. This calculator exists to give you a working idea of the materials a job needs and a rough cost — not numbers to commit money or construction to. Check the figures yourself, or with an appropriately qualified professional, before you order, quote, or build. Read the full disclaimer

How this stone calculator works

All stone is the same arithmetic — volume × density — and the type only changes the density and the price:

yd³ = (L × W × depth ÷ 12) ÷ 27 · depth in inches
tons = yd³ × density × (1 + waste%) → rounded up to ¼ ton

Worked example: stone tons for a 15 × 10 bed

150 ft² at 3 in is 37.5 ft³ — 1.39 yd³. In crushed stone at 1.4 t/yd³ that's 1.94 tons; with 5% waste the scale order is 2.25 tons, about $101. One ton stretches ≈ 77 ft² at this depth.

How many tons of stone per cubic yard?

Table 1 — Stone densities
Stonet/yd³1 ton @ 3″
Crushed (¾″ minus)1.477 ft²
Clean #57 / river rock1.3580 ft²
Pea / small decorative1.383 ft²
Generated by this calculator's engine — the site-wide density set.
Table 2 — Which stone page for which job
JobUse
Driveway buildGravel driveway
Base courseRoad base
Decorative bedsRiver rock
Size lookupSize chart
This page is the general tool; those go deeper.

Stone FAQ

How many tons of stone do I need?

Area × depth ÷ 12 ÷ 27 for cubic yards, then × the stone’s density: the default 15 × 10 ft bed at 3 in is 1.39 yd³ of crushed stone — 1.94 tons, ordered as 2.25 with 5% waste, about $101 at $45 a ton.

How do I convert yards of stone to tons?

Multiply by the density: 1.4 tons per cubic yard for crushed stone with fines, 1.35 for clean #57 and river rock, 1.3 for pea and small decorative stone. The picker applies it for you — and the reverse trip lives on the cubic-yards-to-tons converter.

How much does a ton of stone cover?

About 77 ft² at 3 in deep in crushed stone — 80 in clean #57, 83 in pea. Halve those at 6 in. The live coverage line under the drawing recomputes for your depth and stone.

What is the difference between crushed, clean, and decorative stone?

Crushed stone with fines compacts into a structural mat — bases and driveways. Clean (washed) stone stays open and drains — French drains, #57 toppings. Decorative stone (river rock, pea) is round and stays loose — beds and borders, never under load.

How much does a ton of stone cost?

Roughly $35–60 per ton for crushed and clean construction stone in 2026, and $70–130 for decorative river rock and specialty colors, plus delivery. The editable price fields track your local quote.

Embed this stone calculator on your site

Run the stone calculator on your own site, free. Paste the snippet where you want it; the visible credit link is the only condition.

More stone calculators

Order 2.25 t $101 bulk · waste incl.